Oversight-safe reference materials.
Controlled access by request.

What You’ll Find Here

This library contains public-safe materials only.

They are intended to:

  • establish that the system exists and is whole

  • explain purpose and boundaries

  • allow serious readers to self-select into a controlled review lane

These documents are not instructions, templates, or implementation guides.
They are reference artifacts.

Download Public Packet (v1.0)

Contains public-safe reference documents designed to explain scope, boundaries, and outcomes—without exposing internal systems.

Controlled Materials Notice

  • Operational, implementation, and internal governance materials are not publicly available.

  • Controlled review is granted only when there is a legitimate need and appropriate agreements are in place.

  • Public availability does not imply permission to implement, adapt, or represent these systems.

Need deeper review?

If you have a legitimate reason to evaluate controlled materials, use the formal access pathway.

P6RSE Public Library Index

  • Public Shelf Translation Pack — Narrative-Only Edition v1.0
    Plain-English orientation to Permission Six and the structure of this library.

  • AI Operations Governance — Accountability & Continuity Snapshot
    Executive snapshot addressing governance principles for AI operations.

  • Permission Six — Operations Governance Protocols (Public Reference)
    Public reference framing for management-side governance concepts.

  • Two-Hat Truth Doctrine — Plain English System Narrative
    Clarifies separation between authored IP and implementation services.

  • Unsupported Deployment & Liability Boundary — Public Translation
    Defines responsibility, attribution, and risk boundaries.

  • Behind-Glass Access Protocol — Public Translation
    Explains how controlled materials are requested and reviewed.

  • P6-RGI Blueprint — Restoration, Continuity, Recidivism Collapse (Concept Overview)
    Concept-level overview of outcomes and governance posture.

Controlled Materials Notice

Operational, implementation, and internal governance materials are not publicly available.

Controlled review is granted only when there is a legitimate need and appropriate agreements are in place.
Public availability does not imply permission to implement, adapt, or represent these systems.